Ningxia Baofeng Energy Hongsi Coal Mine Rope Replacement Project

The auxiliary shaft lifting method of Ningxia Baofeng Energy Hongsi Coal Mine is multi-rope friction type, the number of wire ropes is 6, the rope diameter is 43mm, and the well depth is 956.6 meters. At 12:00 am on December 16, 2022, the intelligent mechanized rope change method was used to replace the head rope. After 23 hours of continuous struggle, the replacement of the 6 head ropes of the auxiliary shaft hoist was safely and quickly completed, and the rope change time was greatly shortened. The head rope is not damaged during the replacement process, which reduces the labor intensity of workers and provides a strong guarantee for the safe production of mines.



Next

Products and Solutions

Home

  • 4000-422-623
  • Address: 142# Chang'an Road, Xuzhou Hi-Tech Industrial Development Zone, Xuzhou City,Jiangsu Province,China

  • Mobile Terminal

  • Wechat

4000-422-623
Tell us your requirements online


  • Tel: 4000-422-623

    Address: 142# Chang'an Road, Xuzhou Hi-Tech Industrial Development Zone, Xuzhou City,Jiangsu Province,China