@TT-B type double-yard rope ion and exchange intelligent protection device
Shaft hoisting over-winding/over-releasing buffer cage holding device
SLT-B type tankway rope online automatic detection and adjustment device
Ningxia Baofeng Energy Hongsi Coal Mine Rope Replacement Project
The auxiliary shaft lifting method of Ningxia Baofeng Energy Hongsi Coal Mine is multi-rope friction type, the number of wire ropes is 6, the rope diameter is 43mm, and the well depth is 956.6 meters. At 12:00 am on December 16, 2022, the intelligent mechanized rope change method was used to replace the head rope. After 23 hours of continuous struggle, the replacement of the 6 head ropes of the auxiliary shaft hoist was safely and quickly completed, and the rope change time was greatly shortened. The head rope is not damaged during the replacement process, which reduces the labor intensity of workers and provides a strong guarantee for the safe production of mines.
Address: 142# Chang'an Road, Xuzhou Hi-Tech Industrial Development Zone, Xuzhou City,Jiangsu Province,China
Mobile Terminal
Tel: 4000-422-623
Address: 142# Chang'an Road, Xuzhou Hi-Tech Industrial Development Zone, Xuzhou City,Jiangsu Province,China